Home MenuWeston and Lochmere Bridge Repairs
Overview
As part of Cary’s ongoing efforts to maintain safe and reliable transportation, two bridge repair projects are scheduled:
• Lochmere Drive Bridge – located near the Lake Park boat ramp in the Lochmere neighborhood.
• Weston Parkway Bridges – located where Weston Parkway crosses over Black Creek Greenway.
Lochmere Drive Bridge
This project will involve minor concrete repairs to extend the life of the bridge. The bridge crosses the lake spillway and is an important connector for neighborhood traffic.
Construction timeline: Late-September 2025 to early October 2025
Traffic impacts: Flagging operations during work hours will guide traffic safely through the area.
Weston Parkway Bridges
Repairs will be made to the bridge decks and supports to prevent water infiltration and maintain long-term reliability. This work is being coordinated with the Black Creek Greenway renovations to help reduce impacts to greenway users.
Construction timeline: Work begins this fall and is expected to be completed in early 2026 (weather dependent).
Traffic impacts:
• Lane closures and detours will be required.
• Two-way traffic will be maintained, but shifted to either the eastbound or westbound lanes depending on the phase.
• Detour maps will be posted here once available.
Frequently Asked Questions
Q: Why are these repairs necessary?
A: Routine maintenance extends the lifespan of bridges and prevents more costly repairs in the future. These projects are based on recommendations from NCDOT’s biennial bridge inspection program.
Q: Will traffic be impacted?
A: Yes. Drivers can expect lane closures and flagging operations on Lochmere Drive and Weston Parkway. On Weston Parkway, traffic will be shifted into two lanes during certain phases of construction.
Q: How long is construction anticipated last?
A: Lochmere Drive: Less than a month.
Weston Parkway: Approximately three months.